Using EVM On Flow
EVM Wallets​
Applications deployed to EVM on Flow will work with popular EVM-compatible wallets such as MetaMask, all you need to do is add the correct RPC endpoint as a custom network.
MetaMask​
Manually method: Add EVM on Flow as a custom network to MetaMask:
- Open the MetaMask browser extension
- Open the network selection dropdown menu by clicking the dropdown button at the top of the extension
- Click the
Add network
button - Click
Add a network manually
- In the
Add a network manually
dialog that appears, enter the following information for Previewnet:
Name | Value |
---|---|
Network Name | Flow Previewnet |
Description | The public RPC url for Flow Previewnet |
RPC Endpoint | https://previewnet.evm.nodes.onflow.org |
Chain ID | 646 |
Currency Symbol | FLOW |
Block Explorer | https://previewnet.flowdiver.io |
- Tap the Save button to save Flow Previewnet as a network.
You should now be able to connect to the EVM on Flow by selecting it from the network selection dropdown menu.
Use the Flow Previewnet Faucet to fund a new account for testing.
Flow Native Wallets​
Flow Wallet (Coming Soon)​
Flow Wallet is available on Android and iOS, with desktop support using the Flow Wallet Chrome extension. In addition to being able to transact in both EVM and Cadence environments, Flow Wallet will also allow you to view and move assets between EVM and Cadence, making it possible to manage all your assets in one place.
To use the Flow Wallet Chrome extension:
- Open the Flow Wallet browser extension and create your account.
- Connect to an app using Flow Wallet.
Details​
- Flow EVM: A virtual EVM-based blockchain on Flow using the latest EVM byte-code interpreter
Geth v1.13
. - FLOW Token Usage: Utilizes
FLOW
token for transactions, with balances denominated inAtto-FLOW
(1FLOW
= 10^18Atto-FLOW
).
Composability:
- Cadence Calls: Cadence can call Flow EVM.
- Extended Precompiles: Extended EVM smart contracts interact with Cadence.
- Cadence-Owned-Account (COA): Allows a Cadence resource to own/control an EVM address.
For further details refer to FLIP 223: EVM integration interface